This blog was created to answer questions regarding all types of marine construction. Issues regarding docks, decks, boathouses, seawalls for residential and commercial applications can be addressed here. Rick Fender of Cloud 9 Services, Inc. dba Fender Marine Construction at 1201 West Jackson Street Orlando, Fl 32805 is a member and currently on the Board of Directors for the Florida Marine Contractors Association and can be reached at 407.481.2750.
Friday, June 10, 2016
Wednesday, July 10, 2013
Recent Lake Holden HOA Newsletter Article about the New Dock Design
Saturday, June 15, 2013
Press Releases for Marine Contractors
Orlando Boat Dock Builder, Fender Marine Construction Announces New Upgraded Boathouse Design
"Fender Marine Construction has always built quality docks, decks seawalls and boathouses, but now with the addition of their new Platinum boathouse and dock design, the company rises to the next level,” says Fender. “In addition to the quality of materials and workmanship, this new top end boathouse design features additional trim on the dock such as skirt boards, vinyl or Brazilian Hardwood decking, stronger framing, heavier piling, heavy duty artistic roof beams and upgraded roof decking,” explained Fender……………………………………..
“The new roof structure is also different than any of the other Orlando dock builders construct in that it features 3”x6” and 3”x8” roof beams with the rafter tails scroll cut” said Fender. Fender went on to say that the roof beams are spaced 48” apart where normal 2”x8” rafters would need to be 16” to 24” apart. “We are able to increase the spacing between the rafters because of the roof decking being stronger real tongue and groove V-joint 2”x6” Southern Yellow Pine” Fender said………………………………………………..
“Normally the Platinum boathouse and covered activity deck projects feature a tile or metal roof” said Fender. “This new upgraded boathouse venture blows away the competition in quality of materials, sizes of materials, quantity of materials, craftsmanship and aesthetic design” exclaimed Fender.
Fender Marine Construction is located at 1201 West Jackson Street Orlando, FL 32805. Potential clients can contact Fender Marine through our website at http://www.FenderMarine.com, email Rick@FenderMarine.com or call 407-481-2750 now.
Tuesday, April 10, 2012
Selecting a Florida Marine Contractor
Monday, September 26, 2011
6006F Scope Sheet
https://www.ncci.com/rws/folder/printfile.asp?file=SCOPE110926525763500.htm 9/26/2011
6006F- The Mystery of United States Longshore and Harborworkers Act Insurance
Saturday, July 23, 2011
Orange County Environmental Protection Department’s Environmental Streamlining Task Force
FDEP spoke about the SLERP which is the State Lands and Resources Environmental Permit. They explained that they serve the Governor, Secretary, Army Corp, SJRWMD and SFWMD as well as the Board of Trustees of the Internal Resources.
They stated that almost all work on land, wetlands and water bodies requires an Environmental Resource Permit. Some of the projects the review include marinas, docks and seawalls.
The State’s streamlining efforts include giving more exemptions, Noticed General Permits and self certifications. They are becoming more “lean” and are helping applicants to acquire the permits. Their goal is to provide 90% of the permits that they handle within 180 days.
They made fun of the Self Certification process showing a photograph of boathouse in the middle of a lake with the access walkway underwater. They stated that 23% of the Self Certified projects are out of compliance.
Most of the meeting dealt with State agencies and permitting but Orange County did say that in their process of streamlining their permitting, they would consider doing away with duplicate permitting if the State if already permitting an activity.
I, Rick Fender of Fender Marine Construction representing the Florida Marine Contractors Association Central Florida Chapter spoke about the County’s and State’s streamlining efforts. On beneficial planting permits in Orange County, contractors are required to procure a permit from OCEPD and then the same information and plans must be submitted to FMC (Fish and Wildlife Commission) for their permit. The County charges a fee for their permit but the State does not. Further, when we make application with the County for the beneficial planting permits, they contact the State FWC to let them know to contact us for the duplicate permit.
I recommend that all marine contractors and other interested parties attend the next one of the Environmental Streamlining Task Force meetings so that you can understand where they are going and provide your comments on the direction of the Task Force. You can find them at http://www.orangecountyfl.net/YourLocalGovernment/CountyDepartments/CommunityandEnvironmentalServices/EnvironmentalProtectionDivision/EnvironmentalStreamliningTaskForce.aspx.
Rick Fender, Vice President- Fender Marine Construction
Chapter Chairperson- Florida Marine Contractor’s Association
Monday, December 6, 2010
The power of the consumer when dealing with licensed marine contractors
If a property owner hires a State licensed marine contractor, they do have an enormous amount of power over that contractor. If the property owner has a problem with a licensee, the property owner has the following options:
If the licensed marine contractor abandons the project and refuses to return the customer’s call, one remedy is for the customer to call the DBPR or send DBPR a complaint form. The DBPR will then contact the contractor to resolve the issue. Every licensed contractor who wishes to maintain their license will immediately work with the DBPR and get the issue resolved right away.
Even if the licensed marine contractor has gone out of business or is dodging the DBPR, the residential consumer can go for the Florida Construction Industry Licensing Board’s Construction Industry Recovery Fund to recover all or a portion of their losses. The rules for the fund read: Payment may be available from the construction industries recovery fund if you lose money on a project performed under contract, where the loss results from specified violations of Florida Law by a state-licensed contractor. For information about the recovery fund and filling a claim, contract the Florida Construction Industry licensing Board at the following telephone number and address: Department Of Business and professional Regulation, Construction Industry Licensing Board, 7960 Arlington Expressway, Suite 300, Jacksonville, Florida 32211-7467. Telephone: (850) 727-3650.
All residential construction contracts are required to contain this clause. The fund provides residential property owners who contract with licensed contractors with the ability to recover up to $50,000.00 if they have been ripped off or otherwise damaged by that licensed contractor.
You may review the Florida Statutes by clicking on: www.myflorida.com/dbpr/pro/cilb/index.html and click on Statutes and Rules.
Call Rick Fender, the Vice President of Fender Marine Construction for additional information at 407-481-2750 and http://www.fendermarine.com/
Tuesday, October 26, 2010
Belle Isle Florida Boat Dock Regulations
Sec. 48-31. - Application process.
(a)Permit and review. Any person desiring to construct a boat dock, regardless of whether it is made of wood or another material, within the city shall first apply for a permit to construct the boat dock. Applications shall be made to the city. Upon receiving the application, a city administrative officer shall perform a site review of the proposed dock location. The city shall review the application and shall contact the applicant if the application fails to meet any of the requirements set forth in this section.
(1)City's administrative review fees. An administrative review fee of $165.00 shall be paid at the time the application is submitted. The administrative review fee does not include the Orange County building permit's processing fee.
(2)Application. The applicant shall submit a city boat dock application, a county boat dock application, a survey and three sets of plans showing the dock. These forms shall be available in the city hall office. The survey and plans shall provide accurate information as to all of the following items:
a.An arrow indicating the northerly direction and an indication of the scale to which the drawing was prepared;
b.The dimensions of the property, and the length and location of the proposed dock;
c.The exact distance between the existing shoreline, at the point where the dock is to be constructed, and a permanent object or construction (e.g., house, tree) to be used as a reference point;
d.The exact distance of setbacks from adjacent property lines, and an approximation of the distance from the closest dock on each side of the property;
e.The floor and roof elevation of the proposed dock, boathouse or other structure connected to the dock;
f.The depth of water at the end of the proposed dock; and
g.A survey, performed within the last three years, of the property indicating the normal high-water elevation of Lake Conway (86.9) as established by the county on October 25, 1982.
(3)Building permit. Following the approval by the city of a boat dock application, the applicant is also required to obtain a building permit from the county building department prior to commencing construction. In the event electricity is run to the boat dock, the proper electrical permit must also be obtained from the county building department.
(b)Commencement and completion of construction. All construction must be commenced, or completed, or both, within the guidelines established by the county building department. The applicant is responsible for all fees associated with the procurement of the necessary permits.
(Ord. No. 92-6, ch. V, art. A, § 1, 12-15-1992; Ord. No. 04-03, § 5, 3-12-2004)
Sec. 48-32. - Design criteria.
Boat dock applications shall be reviewed under the following rules and regulations:
(1)Setbacks. Boat docks shall have a minimum side setback of five feet from the projected property lines of all abutting shoreline properties.
(2)Length. Consideration will be given to the length of other docks within 300 feet on either side of the proposed dock and to any previous length restrictions that the city council may have established. For comparison, the length will be measured from the existing shoreline, with reference to a fixed object or structure on the lot. If there are no other adjoining docks in the vicinity, then the maximum length of the boat dock shall not exceed 40 feet measured from the 86.9 normal high water elevation contour line of Lake Conway, as marked by a registered surveyor, to the lakeward end of the dock.
(3)Total area. A boat slip, platform and any other portion of the dock, covered or uncovered, collectively may not exceed 500 square feet in total area.
(4)Height. Except for floating docks, the minimum height of boat dock decks shall place them one foot above the normal high water elevation of Lake Conway. The maximum height, which is to be measured from the top of the structure, shall be 13 feet above the normal high water elevation of Lake Conway. The minimum height of a floating dock deck shall be one foot above the water level.
(5)Walkway. That portion of the dock lying waterward of the 86.9 feet contour line of Lake Conway as established by the county on October 25, 1982 and extending to the juncture of the slip or platform, whichever is closest to the shore. A walkway shall be a minimum of four feet in width. The area for a walkway shall not be included as part of the total area for the structure unless the walkway exceeds four feet in width. In such cases, the excess square footage generated by the width in excess of four feet shall be included in the total area for the platform and/or slip.
(6)Number and location of boat docks.
a.No boat dock construction permit shall be issued on a lot or combination of lots that does not have a principal building first located thereon.
b.Only one boat dock per principal building that is located on a lot or combination of lots shall be allowed on any such lot or combination of lots.
c.Boat docks shall only be permitted on lots or combinations of lots zoned or used for residential purposes, and no boat docks shall be permitted on any lot or combination of lots used for agricultural, commercial, professional-office and/or industrial purposes.
d.Boat docks on public property and/or homeowners associations lots shall be exempted from provisions of subsections (6)a and b of this section. However, only one boat dock per parcel may be located on public property and/or homeowners association property. The term "parcel" shall mean all contiguous property owned by a homeowners association or by a public entity.
e.All boat docks shall be permanently affixed to the lake bottom, and shall be subject to the provisions of this article except where noted.
(7)Restrictions. All boat docks shall adhere to the following restrictions:
a.No work shall be within areas which constitute easements for ingress or egress, or for drainage.
b.No structures having flat roofs will be permitted. The pitch of the roof shall have a minimum slope of 2:12 and a maximum slope of 5:12.
c.No structure having enclosed sidewalls shall be permitted. This includes areas for fueling and/or storage facilities. The term "enclosed" shall be defined as, by way of example but not by limitation, screen enclosures, chainlink fencing, lattice fencing and any form of paneling.
d.Under no circumstances shall a permit for the construction of a boat dock to be utilized for residential purposes be issued.
e.No permit applications will be accepted unless there is a principal building established on the property, or a building permit has been issued to construct said building.
(Ord. No. 92-6, ch. V, art. A, § 2, 12-15-1992; Ord. No. 95-4, 4-18-1995; Ord. No. 98-2, 4-21-1998)
Sec. 48-33. - Variances.
In the event the applicant wishes to construct a boat dock in excess of any of the criteria mentioned in section 48-32, a variance must be applied for to the board. There shall be a $100.00 application fee for the first variance and a $50.00 fee for each additional variance requested at the same time. The board shall not approve an application for a variance unless and until each of the following criteria have been met:
(1)The boat dock shall not create conditions hazardous to navigation nor any safety hazards;
(2)The location and placement of the boat dock shall be compatible with other docks in the area, and the shoreline contour of the lake;
(3)The current level of the lake shall not be a factor in deciding whether to approve or deny a variance; and
(4)The requirements of section 42-64(1) except for subsection 42-64(1)d.
(Ord. No. 92-6, ch. V, art. A, § 3, 12-15-1992; Ord. No. 04-03, § 5, 3-12-2004)
Sec. 48-34. - Boat docks not on Lake Conway.
(a)Any person desiring to construct a boat dock in an industrially zoned district shall be subject to the provisions of this article except as follows:
(1)A boat dock constructed in an industrially zoned district shall not be required to comply with the provisions of section 48-32 except that all boat docks shall be permanently affixed to the water body bottom; and
(2)The survey required by subsection 48-31(a)(2)g. shall indicate the normal high water elevation (if any) of the applicable body of water.
(b)Zoning approval for construction of a boat dock on a waterway other than Lake Conway shall be subject to the following criteria:
(1)The boat dock shall not create conditions hazardous to navigation.
(2)The boat dock shall not create any safety hazards.
(3)The boat dock shall not interfere with the riparian rights of any adjacent property.
(4)The boat dock shall have a minimum setback of five feet from projected property lines of all abutting shoreline properties.
(Ord. No. 06-04, § 1, 4-4-2006)
Secs. 48-35—48-60. - Reserved.
Thursday, August 19, 2010
Aluminum Floating Dock for Haines City Park
Boathouse Orlando with difficult soils but great results!
Just got this photo of the Johnson boathouse- Giant 30' long for the hugh 28' float boat. We upgraded the lift system to 6,000 lb capacity boat cradle, lift motor and gear assembly. Great marine construction project for really wonderful customers!
Saturday, August 14, 2010
Cloud 9 Services, Inc. forms dba Fender Marine Construction
Monday, October 5, 2009
Florida Marine Contractor's Association Uninsured Enforcement Success
Until recently, uninsured marine contractors were able to build docks and seawalls on “non-navigable” waterways with no repercussions from the State of Florida’s Division of Workers Compensation if that contractor had no Workers Compensation coverage (code 6006F) in force. Past case law prohibited the State from pursuing violators and issuing “Stop Work Orders” because of a loop hole concerning enforcement jurisdiction of State Act coverage (regulated by the State of Florida’s Division of Workers Compensation) and United States Longshoreman and Harbor Worker's Act (USL&H) (regulated by the Department of Labor).
Bottom line, marine contractors who have been losing work due to the under priced estimates of uninsured contractors can now seek assistance from the State to issue “Stop Work Orders” at jobs that are on “non-navigable” waterways.
This is a huge step forward for the marine industry in getting the State to step up to assist on this matter, because up until now, they would only refer frustrated inquiries to the Department of Labor. As many of you know, due to funding and government cutbacks, the Department of Labor does not proactively enforce the need for USL&H coverage for “jobs in progress”.
At an upcoming FMCA Central Florida Chapter meeting being held on Wednesday, October 14th, we hope to address enforcement of USL&H with the Department of Labor of uninsured contractors working on “navigable” waterways.
In the meantime, violators can be reported via the web by going to: www.myfloridacfo.com/wc Go to the area located on the center right of the web page entitled: Report Suspected Workers’ Comp Non-Compliance. People can check their local phone listings to their local representatives. In Central Florida, Terence Phillips can be reached at 407-835-4467. In Tallahassee, William Dorney can be reached at 850-413-1825.
FMCA continues to work hard to benefit its members and looks forward to pressing forward on the challenges the marine industry faces.
Respectfully submitted,
Rick Dalrymple, CPIA, CMIPFMCA Chapter Director, Central Florida(407)998-4108 Fax: (407) 788-7933Email: Rick.Dalrymple@IOAUSA.comWeb: http://www.ioausa.com/
For the finest in Marine Construction in Florida, call Rick Fender @ Cloud 9 Services, Inc. 407-481-8383
Wednesday, July 1, 2009
Seawall and retaining Wall Repair Solutions
Following the hurricanes back in 2003 and 2005, there was a flurry of dock and seawall reconstruction in Central Florida. When there is so much opportunity for work, every guy with a pickup truck becomes a marine contractor. The problems with hiring an inexperienced licensed contractor to perform marine construction such as docks, seawalls, retaining walls, boardwalks, boathouses, channel markers, mooring piles and marinas. There are special skills and techniques as well as specialized equipment required for marine construction repair and new construction projects to be successful.
Today I met with a customer in Phillips Landing on Sand Lake. She had a non-marine contractor install a 5’ high and 250’ long aluminum seawall after the hurricanes. She called me because the wall was falling over into the lake. Not only is the damaged seawall dangerous to walk around but the beautifully landscaped yard is about to be destroyed. This wall needs to be repaired immediately.
It appears that the seawall or retaining wall failure was a result of a combination of mistakes made by the contractor. The wall did not have any ports in the face of the wall to allow water to flow from behind the wall. This causes the seawall to fail as a result of the hydrostatic pressure building behind the wall.
The homeowner did the right thing by requiring the contractor to be licensed and to procure a building permit. However, the contractor was fly-by-night and is now out of business. There is no company left to stand behind the wall construction. The customer did not require that the seawall contractor be a member of the Florida Marine Contractor's Association which requires its members to not only be appropriatley licensed but also carry the required United States Longshoreman's Insurance.
The solution we suggest is costly but effective. We would remove the soil from behind the wall where the wall has begun to lean and bow. We would then install new deadmen and tiebacks between the old tiebacks. We would then use a mini-excavator to pull the wall back into a vertical position. We would replace portions of the seawall cap where it cannot be reused. After the wall is straight, the original deadmen and tiebacks will be adjusted to pick up a portion of the load exerted on the wall by the soil. After the deadmen and tiebacks are right, we would carefully backfill against the wall. Once the wall is backfilled, the tiebacks are adjusted again and the yard is cleaned up and sodded.
We would install vents in the seawall face to allow water to pass from behind the wall into the lake through the wall. This will limit the hydrostatic pressure building up behind the wall during the wet season here in Florida.
There are other solutions available that do not require digging up the yard to install deadmen. We will go into that system in another entry to my marine construction blog.
If you need help with marine construction anywhere in Florida, feel free to contact Cloud 9 Services, Inc. We are State Certified Marine Contractors. 407-481-2750.
Saturday, February 28, 2009
Unlicensed and underinsured contractors
If the consumer knows that that is the requirement, homeowners would never pull the permit. This can best be stopped at the building department level. The other day I was attempting to procure a permit for an extensive dock repair with one of my customers. He and his engineer had prepared the plans for the permitting. I took my customer who is over 80 years old with me to get the permit in case the plans examiners had questions for him. When we appeared at the permit intake desk, the lady assumed that I was an unlicensed contractor helping the owner to pull the permit so that I could illegally repair his dock. She directed us to fill out the Homeowner’s Affidavit form that the building departments supply that basically states that the owner is going to perform the work himself or with family or with insured employees withholding payroll taxes. It was apparent that there was no way that the owner was capable of installing the piling for the dock as was required in the permit and the permit intake lady knew that. But she sent us over to fill out the form fraudulently. When I advised her that I am a Florida State Certified Marine Contractor, then of course the form was not needed. But had I not indicated that I was a licensee, we would have gotten the permit and if I were unlicensed and uninsured and performed the work, the project would have been performed illegally exposing the customer to great risk.
If the DBPR educates the building/permitting departments and gets their cooperation on this, we would cut unlicensed activity in the State by at least 70%. This would mean a lot less ripped off consumers. There would be significantly less docks and seawalls being built over neighbor’s property lines, built incorrectly and a lot less pain and suffering associated with such things.
Another way to view this issue is to consider an unlicensed doctor. By being unlicensed, he is showing that he lacks the ability to become licensed and exposes the consumers to great harm. Unlicensed doctors go to jail. In fact all the licensed doctors who went to school, passed their tests, performed their internship and became a part of the medical establishment would be up in arms if they knew of an unlicensed doctor seeing patients and performing operations. What of the consumer? If he did not know that the doctor was unlicensed and perhaps there were forged documents on the wall or websites showing the doctors fine work, well then the poor consumer has been duped and could suffer greatly. But what about the consumer that goes to the doctor knowing that the doctor is unlicensed and breaking the law? For the illusion of saving money, they are willing to help the doctor break the law that was designed to protect the consumer?
I don’t feel that the consumer deserves the bad workmanship or lack of exposure to loss without recourse that they receive working with the unlicensed doctor. They may have not been educated on the serious ramifications of dealing with an unlicensed professional.
For marine construction, United States Longshoreman and Harborworker’s Act insurance is required. Through our work at the Florida Marine Contractor’s Association, we have gotten the cost of the coverage reduced significantly. It is now an additional rider on top of the normal worker’s compensation insurance. Our code for Workers Comp for dock and seawall building is 6006F. While we are training the building/permitting departments about the unlicensed activity, we hope to also train them to reject contractors from permitting docks or seawalls if on or adjacent to any water body unless they have the 6006F on their policy. This further protects the consumer in case one of the workers is injured. Learn more about worker's compensation fraud.
If we can stop unlicensed contractor activity, the consumer will be better off, the economy will be better off and the contractors who have paid their dues by procuring the experience, the licensing and the insurance to work as professionals for the public will be better off. Everyone wins except the criminals who should not win. Crime should not pay, but until we can stop unlicensed and uninsured and underinsured contractor activity, crime does pay.
For a licensed marine contractor with the appropriate insurance to protech thier employees and customers, contact Cloud 9 Services, Inc. at 407-466-9952
Thursday, July 31, 2008
Dock and boathouse amenities
After the last Board of Director’s Meeting of the Florida Marine Contractor’s Association this past July, my wife Lucy and I hosted a small party at our home for the meeting attendees. The purpose of the party was to entertain my fellow Board Members and their families and enjoy their company. I also wanted to show off some of the amenities that I sell with the docks I build. I try to get my prospective customers to come to my house and check out the work so that they can get an idea of the craftsmanship, design and possible amenities they could enjoy by working with Cloud 9 Service, Inc.
At the party, I discovered that most of my coastal brother and sister marine contractors do not have the ability to build covered decks or boat houses in their area. For those of you who are able to build covered activity decks and are not as limited on the maximum square footage allowed, I offer these design and amenity tips.
When designing your access walkway and you say have a stand of trees and you could just draw a straight line to get to the terminal platform or you could meander the walkway through the trees, choose to meander. I tell my customers that getting to the terminal platform is a major portion of the enjoyment of having and dock. It costs more money for the added walkway, but it is worth it.
When adding lighting to the dock or walkway, we use trim boards to conceal the wiring and we use lights that shine down onto the deck as opposed that shine out and cause light pollution. I am considering adding rope lighting to the sides of the terminal platform and walkway, but if I do, it will be behind a skirt so that the light shines down into the water as opposed to shining out across the lake.
In Central Florida, we are permitted to have covered activity decks. Cloud 9’s header system for the roof is comprised of (2) 2x10s sandwiching the 6x6 piling with a 2x6 at the bottom forming a trough beam. This trough beam allows us to add recessed can lighting in various colors and attached to a dimmer, it can be very beautiful. For my activity deck I also added LCD TVs driven by a DVD player with speakers hidden in an enclosed box in the ceiling. Sometimes we play movies but we mainly play music videos when we are entertaining. Then for the real parties we added a disco light that simulates waves of light across the deck, water and ceiling.
The summers are so hot here that we really can’t sit out on the covered activity deck without over heating or being eaten by mosquitoes. Those problems were solved by the addition of a water mist system to the box beam header system over the covered activity deck portion of the terminal platform area. The mist can reduce the ambient air temperature by up to 30 degrees depending on the relative humidity of the air. When you add the black lights, disco lights, blue recessed can down lights to the mist, it is a party on the water.
Since we planned the covered activity deck as a separate entertainment area, we finished it off with a granite table(wind stable) and chairs, a small drink frig and a waste and recycle bin area.
I know many of you have your own great ideas of amenity packages and I encourage you to write about them in an article like this and send to the Editor(Steven Webster) for publication of the FMCA. In this way, all of our fellow members and our customers across the State and Country can share our ideas that could help our businesses and make our lives more enjoyable. Rick Fender Cloud 9 Services, Inc. 407-481-2750
Friday, November 9, 2007
Decking Options for docks, decks and walkways
There are many decking options available to dock and deck owners here in Central Florida. In this article I will try to touch on a few of the wood decking materials I use with the benefits and challenges associated with each one.
The natural wood decking materials can be the domestic Southern Yellow Pine or Cypress or the imports such as the Brazilian Hardwoods. The Southern Yellow Pine decking normally offered on the standard deck or dock is pressure treated to .40 ACQ or CA. These treatment chemicals are now in use since the EPA ruling making the use of CCA pressure treated wood illegal for all marine uses except for structural timbers. The #1 grade of Southern Yellow Pine should be used as a minimum if you choose to go with a Pine deck. I recommend the use of 2”x6” boards for the decking without a gap being placed between the boards. As the deck boards dry out, they will develop their own gap of approximately 1/4".
The 2”x6” Pine decking will allow you to have your joists spaced 24” on center whereas if you use the less expensive 5/4”x6” Pine decking I would space the joists 16” O.C.
If you are on a tight budget, the 2”x6” #1 pressure treated Southern Yellow Pine is the way to save money in the short term. However, in order to keep the wood surface looking good for years to come, you will need to perform periodic maintenance on the decking. This includes lightly pressure cleaning and sealing every 12 to 24 months for the life of the deck. There are several types of stains and paints that are made specifically for use on pressure treated Pine decking. The one I recommend most is Spa-n-deck from The Flood Company. The best price I have found for this ultra-violet wood protectant and stain is from Decks & Docks Lumber at 4801 95th St, N St. Petersburg, FL 33708. Contact: Mr. Dan Gileo phone: 727-399-9663 fax: 727-399-8453 email: decksanddocks@tampabay.rr.com website: http://www.decks-docks.com/.
Of course the #1 Pressure treated Southern Pine decking is available from several lumber yards around town. I deal with Southern Pine on Hansel Avenue in Pine Castle. They deliver in a timely manner and the quality of the decking is good. Their phone number is 407-251-1900.
Another type of Southern Yellow Pine decking that I recommend is the “UltraWood” 2”x6” decking. This Pine is a grade above the basic #1. It is a #1 dense or better grade which means the wood grain is tighter, the knots are smaller and because the edges are rounded(eased), there is very little wane. This means almost every piece of the wood is good for decking and requires very little culling. Another reason and I feel the most important reason to buy this “UltraWood” is that during the pressure treatment process, it is also treated with a water repellent. This means that the normal hydration and dehydration which occurs to the decking when it rains and dries out does not occur with the “UltraWood” to the extent that it does with normal #1 Pine decking. This constant expanding of the wood when it gets wet and then shrinking again when it dries out causes the wood to splinter and crack prematurely. Certainly painting and applications of the “ultra-violet wood protectant” to the normal #1 will help slow this natural weathering and inevitable aging of the wood, starting with the “UltraWood” decking is a great way to make sure you deck will have a long life. The “UltraWood” can also be stained and treated with the ultra-violet wood protectant.
The most beautiful of the wood decking products that I have found are the Brazilian hardwoods. This material is sometimes called “Ironwood” and there are several different types with different colors and grains. It is the same decking used by Disney World on most of their wood deck area. It is very good for not splintering since the fibers of the wood are very dense and almost hair like when they are cut. There are three ways you can go with the maintenance of this wood. You can choose to simply do nothing to it and it will dry and weather to a silver gray. You could also choose to apply a nut oil called “Penofin” to the Ipe to get a very rich Mahogany brown color and deep luster to the wood. The challenge with the Penofin is that it must be applied several times over the next few years. The Penofin oil tends to build up after every application so that the frequency the application is required decreases over the years. The Penofin is available from 84 Lumber in Tavares at 352-742-8500 or Ace Hardware in Cape Canaveral at 321-784-1528. The final treatment I have found for the Brazilian Hardwoods is Floodpro Supreme Performance available from Decks & Docks Lumber as listed above. This coating is water based and carries a 3 year warranty on decks.
The Brazilian Hardwoods are very dense and pre-drilling and counter sinking of the screws is required. You must use carbide blades for sawing and carbide drill bits for drilling. A 5/4”x6” deck board can span up to 36” but I always use it with 24” O.C. joists. Lumber dealers carry the Ipe in a 1” nominally thick deck board which is reported to span up to 24” but I have not tried it as I use the 5/4” thick board. Even though there is some periodic maintenance required for the mahogany look of the Ipe to be maintained, I think as it is the most beautiful natural wood decking, it is worth it.
Next article I will write about the composite and plastic decking that is setting the market on fire.
Cloud 9 Services, Inc. is a Central Florida Marine Contractor. We build boat docks, boathouses, decks, boardwalks, gazebos, pergolas, seawalls, retaining walls- both commercial and residential. Our State Certified General Contractor's License number is CG C026854. Our website is http://www.cloud9services.com/. We can be reached by email at rick@cloud9services.com. Our phone number is 407-481-2750. We are members of the Florida Marine Contractor's Association whose website is http://www.fmca.us/.